NEW OFFICE AND OPERATIONS FACILITY

Estimated Cost: $15 million

Design and construct a new office and operations center.  The agency has outgrown the current facility which is located in the heart of residential zoning. The new facility will be more centrally located with room for future expansion. It will also be built with backup power generation and seismic resiliency.

Design: Spring 2020 – Spring 2021

Bid: May 2021

Construction:  Summer 2021 – Fall 2022

Share This:

Posted in ,