Estimated Cost: $15 million
Design and construct a new office and operations center. The agency has outgrown the current facility which is located in the heart of residential zoning. The new facility will be more centrally located with room for future expansion. It will also be built with backup power generation and seismic resiliency.
Design: Spring 2020 – Spring 2021
Bid: May 2021
Construction: Summer 2021 – Fall 2022