REPLACEMENT AND ADDITION OF FIRE HYDRANTS
Ongoing replacement and addition of 10 fire hydrants per year located throughout Sunrise’s service area.
Read MoreNEW OFFICE AND OPERATIONS FACILITY
Estimated Cost: $15 million Design and construct a new office and operations center. The agency has outgrown the current facility which is located in the heart of residential zoning. The new facility will be more centrally located with room for future expansion. It will also be built with backup power generation and seismic resiliency. Design:…
Read MoreSUNRIDGE PNEUMATIC PRESSURE ZONE REHAB
Estimated Cost: $100,000 Design and construct an upgraded pneumatic system and add back-up power. The current system is outdated and is approaching the end of its useful life. The new system will add redundant pumping and backup power generation. Bid: December 2020 Construction: January 2021
Read MoreRESERVOIR 11
Estimated Cost: $8.2 million Constructing a 3 million gallon, concrete wire-wrapped cylindrical tank at 147th Ave and Faris St. Provides much needed storage for Sunrise’s largest service level. Construction: April 2018 – December 2020 Project Updates